<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" version="2.0">
  <channel>
    <title>Finance Atena Insights</title>
    <link>https://blog.atenait.it/en/blog</link>
    <description>News, events, and in-depth insights into the world of Atena Finance, featuring our perspective on investment opportunities in markets and companies.</description>
    <language>en</language>
    <pubDate>Mon, 14 Sep 2026 13:44:47 GMT</pubDate>
    <dc:date>2026-09-14T13:44:47Z</dc:date>
    <dc:language>en</dc:language>
    <item>
      <title>Leverage in Predictive Analytics</title>
      <link>https://blog.atenait.it/en/blog/leverage-in-predictive-analytics</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://blog.atenait.it/en/blog/leverage-in-predictive-analytics" title="" class="hs-featured-image-link"&gt; &lt;img src="https://blog.atenait.it/hubfs/Leva%20finanziaria.svg" alt="Leverage " class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p style="text-align: justify;"&gt;&lt;span style="font-size: 1rem;"&gt;Imagine a project with 10 million euros in capex, where all the time spent on financial analysis is devoted to recalculating the &lt;span style="font-weight: bold;"&gt;financial leverage&lt;/span&gt; n times, varying it from 10:90 to 30:70, with thethe goal of reaching the holy grail of a NPV close to 0 (or a WACC of 0.55%, as required by current regulations for projects with public funding) and making the project appealing to the public administration.&lt;br&gt;&lt;br&gt;Then imagine talking to the investor and discovering that they have a maximum of 100,000 euros in equity to put into the project. The rest remains to be seen. Or imagine the opposite scenario. The investor brings a consortium with them, and they have enough equity to fully cover the &lt;span style="font-weight: bold;"&gt;investment’s value&lt;/span&gt;.&lt;/span&gt;&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://blog.atenait.it/en/blog/leverage-in-predictive-analytics" title="" class="hs-featured-image-link"&gt; &lt;img src="https://blog.atenait.it/hubfs/Leva%20finanziaria.svg" alt="Leverage " class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p style="text-align: justify;"&gt;&lt;span style="font-size: 1rem;"&gt;Imagine a project with 10 million euros in capex, where all the time spent on financial analysis is devoted to recalculating the &lt;span style="font-weight: bold;"&gt;financial leverage&lt;/span&gt; n times, varying it from 10:90 to 30:70, with thethe goal of reaching the holy grail of a NPV close to 0 (or a WACC of 0.55%, as required by current regulations for projects with public funding) and making the project appealing to the public administration.&lt;br&gt;&lt;br&gt;Then imagine talking to the investor and discovering that they have a maximum of 100,000 euros in equity to put into the project. The rest remains to be seen. Or imagine the opposite scenario. The investor brings a consortium with them, and they have enough equity to fully cover the &lt;span style="font-weight: bold;"&gt;investment’s value&lt;/span&gt;.&lt;/span&gt;&lt;/p&gt;  
&lt;img src="https://track-eu1.hubspot.com/__ptq.gif?a=25513326&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fblog.atenait.it%2Fen%2Fblog%2Fleverage-in-predictive-analytics&amp;amp;bu=https%253A%252F%252Fblog.atenait.it%252Fen%252Fblog&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <category>Platform</category>
      <category>Consulting</category>
      <pubDate>Fri, 11 Mar 2022 09:00:00 GMT</pubDate>
      <author>paolo.zammitti@atenait.it (Paolo Zammitti)</author>
      <guid>https://blog.atenait.it/en/blog/leverage-in-predictive-analytics</guid>
      <dc:date>2022-03-11T09:00:00Z</dc:date>
    </item>
  </channel>
</rss>
